Premier Inn – Wembley Arena
The new development is located within an existing pedestrian boulevard adjacent Wembley Stadium, in North West London and is part of the greater Wembley Park Development Master Plan. The project is split over 2no. phases
• Phase 1 – Enabling Works – phased removal of existing boulevard and installation of all Drainage and Utilities.
• Phase 2 – Hotel Construction – The Construction of a 312no. bedroom Premier Inn, consisting of a piled substructure and 13 storey RC frame with external façade mostly made up of Alucabond & Gebric Cladding, Curtain Walling and Aluminium Windows